Madeley Road, Ealing
15 July — 24 July
Delays likely Traffic control (two-way signals)
Works description: MAINS RENEWAL WORKS ON BEHALF OF THAMES WATER - FW/CW WORKS
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU821H553/MBEL05/I001

A406,A40 Western Avenue, Ealing

25 July — 26 July

Delays likely Road closure

Works description: CYCLICAL ROUTINE MAINTENANCE, FULL CLOSURE AND DIVERSIONS

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG431383159

A4020 Uxbridge Road, Hanwell

22 July — 26 July

Delays likely Contra-flow

Works description: NHHBW,L/A 31,P1,1x25mm MDPE mtrd Supply in in Footway. Our intention isto complete the Permanent Reinstatement in the same phase

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU307000808457120135-001

B4491 Popes Lane, Ealing

22 July — 24 July

Delays likely Traffic control (two-way signals)

Works description: Excavation - Civils team to excavate a 1m by 1m trial dig to identify if the area is suitable for a new telecommunications pole to be installed. 5G! 2-way lights in place.

Responsibility for works: T-Mobile (UK) Limited

Current status: Planned work about to start

Works reference: YN110EAL007-PGN/ERF

Gordon Road, West Ealing

22 July — 24 July

Delays likely Traffic control (multi-way signals)

Works description: Serv Pipe Relay Ex Fitting Sz P Cway & Fway in Carriageway. Ourintention is to complete the Permanent Reinstatement in the same phase

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU301000031097913-004

A4020 The Mall, Ealing

20 July — 19 August

Delays likely Lane closure

Works description: road crossing and 15 meters trench work. 12 x 1.5 jointhole and 3 x 1.5 joint hole. 14 mtrs rx

Responsibility for works: Scottish and Southern Power Distribution

Current status: Planned work about to start

Works reference: LP551S30003229

Madeley Road, Ealing

17 June — 01 September

Delays likely Traffic control (two-way signals)

Works description: Highway improvement scheme

Responsibility for works: Ealing

Current status: Advanced planning

Works reference: DV00665000819

B455 South Ealing Road, Ealing

10 June — 22 October

Delays likely Traffic control (multi-way signals)

Works description: IMGA202336. Replace approximately 1179metres of 14in Cast IronLowPressure gas main with new 355mm PE main by means of insertion.This will include several connections and all services on the street.

Responsibility for works: Cadent

Current status: Planned work about to start

Works reference: AZ0071000838110

A406 Gunnersbury Avenue (north Circular Road)

01 May — 31 August

Delays likely Lane closure

Works description: EXCAVATE TRENCH INSTALL CABLE CARRY OUT JOINTING BACKFILL AND REINSTATE

Responsibility for works: Scottish and Southern Power Distribution

Current status: Advanced planning

Works reference: LP705S30001055

A4000, A40 Western Avenue, Acton

27 February — 23 September

Delays likely Road closure

Works description: Cycle Super Highway 10 - reconstruction and installation of new cycle way - section 58 required

Responsibility for works: Transport for London

Current status: Advanced planning

Works reference: YG432342348

Westway,  Hammersmith and Fulham

27 February — 23 September

Delays likely Road closure

Works description: Cycle Super Highway 10 - reconstruction and installation of new cycle way - section 58 required

Responsibility for works: Transport for London

Current status: Advanced planning

Works reference: YG432342350

 