A406,A4005 Hanger Lane, Ealing
18 July — 19 July
Delays likely Lane closure
Works description: CARRIAGEWAY REPAIRS
Responsibility for works: Transport for London
Current status: Planned work about to start
Works reference: YG430397955
A406,A4005 Hanger Lane, Ealing
18 July — 19 July
Delays likely Lane closure
Works description: Carriageway repairs
Responsibility for works: Transport for London
Current status: Planned work about to start
Works reference: YG430397671
A406,A4005 Hanger Lane, Ealing
18 July — 19 July
Delays likely Lane closure
Works description: Carriageway repairs
Responsibility for works: Transport for London
Current status: Planned work about to start
Works reference: YG430397667
B4491 Little Ealing Lane, Ealing
17 July — 19 July
Delays likely Traffic control (two-way signals)
Works description: Serv Pipe Relay Inc Fitting Sz P Cway & Fway in Carriageway. Ourintention is to complete the Permanent Reinstatement in the same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU301000031290068-001
Madeley Road, Ealing
15 July — 24 July
Delays likely Traffic control (two-way signals)
Works description: MAINS RENEWAL WORKS ON BEHALF OF THAMES WATER - FW/CW WORKS
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU821H553/MBEL05/I001

Madeley Road, Ealing

17 June — 01 September

Delays likely Traffic control (two-way signals)

Works description: Highway improvement scheme

Responsibility for works: Ealing

Current status: Advanced planning

Works reference: DV00665000819

B455 South Ealing Road, Ealing

10 June — 22 October

Delays likely Traffic control (multi-way signals)

Works description: IMGA202336. Replace approximately 1179metres of 14in Cast IronLowPressure gas main with new 355mm PE main by means of insertion.This will include several connections and all services on the street.

Responsibility for works: Cadent

Current status: Planned work about to start

Works reference: AZ0071000838110

A406 Gunnersbury Avenue (north Circular Road)

01 May — 31 August

Delays likely Lane closure

Works description: EXCAVATE TRENCH INSTALL CABLE CARRY OUT JOINTING BACKFILL AND REINSTATE

Responsibility for works: Scottish and Southern Power Distribution

Current status: Advanced planning

Works reference: LP705S30001055

A4000, A40 Western Avenue, Acton

27 February — 23 September

Delays likely Road closure

Works description: Cycle Super Highway 10 - reconstruction and installation of new cycle way - section 58 required

Responsibility for works: Transport for London

Current status: Advanced planning

Works reference: YG432342348

Westway,  Hammersmith and Fulham

27 February — 23 September

Delays likely Road closure

Works description: Cycle Super Highway 10 - reconstruction and installation of new cycle way - section 58 required

Responsibility for works: Transport for London

Current status: Advanced planning

Works reference: YG432342350

 