Forthcoming Roadworks in the Ealing Area

Closures and diversions which may cause problems

 
Participate

Sign up for our Ealing newsletter

Comment on this story on the

Forthcoming Roadworks in The Ealing Area

A4020 The Mall, Ealing

03 July — 03 July

Delays likely Traffic control (two-way signals)

Works description: S81 PLANNED COVER REPLACEMENT--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU026002141GTHG--000003

A4020 Uxbridge Road, Hanwell

01 July — 03 July

Delays likely Traffic control (multi-way signals)

Works description: 1X JOINT HOLE AND 3M OF TRENCH

Responsibility for works: Scottish and Southern Power Distribution

Current status: Planned work about to start

Works reference: LP551S30002737

A406,A40 Western Avenue, Ealing

01 July — 03 July

Delays likely Lane closure

Works description: 27/004 tel0227962 - slot cut c/w sensor loops to repair traffic signals SD3 & SD4 repair feeder plus feed to existing chamber, 22.00-05.00, westbound c/w swapping lane 1 & 2 and f/w to chamber (ped access maintained)

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG516S000000004882

A406 North Circular Road, Park Royal

02 July — 03 July

Delays likely Traffic control (multi-way signals)

Works description: DESILT PIT IN FOOTWAY FOR CUSTOMER CONNECTION

Responsibility for works: VIRGIN MEDIA

Current status: Planned work about to start

Works reference: NK100/SCLJBU/109121/LB17

B452 Northfield Avenue, West Ealing

02 July — 04 July

Delays likely Traffic control (Stop/Go boards)

Works description: 27/020 (STREAM 27/172) - 111032 - slot cut c/w sensor loops to repair traffic signals SD4 repair feeder plus feed to existing chamber, 10.00-15.00, northbound c/w lane 1 and f/w to chamber (ped access maintained)

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG515S000000002338

Madeley Road, Ealing

02 July — 03 July

Delays likely Traffic control (multi-way signals)

Works description: DESILT PIT IN FOOTWAY FOR CUSTOMER CONNECTION

Responsibility for works: VIRGIN MEDIA

Current status: Planned work about to start

Works reference: NK100/SCLJBU/109121/LB16

Pitshanger Lane, Ealing

02 July — 02 July

Delays likely Traffic control (multi-way signals)

Works description: Replace Sewer Cover--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU026002141GZYN--000001

A4020 Broadway, West Ealing

26 June — 04 July

Delays likely  Lane closure

Works description:  Excavation in footway for electricity disconnection. Backfill & reinstate.

Responsibility for works:  Scottish and Southern Power Distribution

Current status:  Planned work about to start

Works reference:  LP551S30003174

B4491 Popes Lane, Ealing

26 June — 03 July

Delays likely  Traffic control (multi-way signals)

Works description:  lay new gas main and services approx 3.1m in f/w and 0.84m in c/way

Responsibility for works:  Fulcrum Pipelines Limited

Current status:  Planned work about to start

Works reference:  WY001NSA23259

Madeley Road, Ealing

17 June — 01 September

Delays likely Traffic control (two-way signals)

Works description: Highway improvement scheme

Responsibility for works: Ealing

Current status: Advanced planning

Works reference: DV00665000819

B455 South Ealing Road, Ealing

10 June — 22 October

Delays likely Traffic control (multi-way signals)

Works description: IMGA202336. Replace approximately 1179metres of 14in Cast IronLowPressure gas main with new 355mm PE main by means of insertion.This will include several connections and all services on the street.

Responsibility for works: Cadent

Current status: Planned work about to start

Works reference: AZ0071000838110

A406 Gunnersbury Avenue (north Circular Road)

01 May — 31 August

Delays likely Lane closure

Works description: EXCAVATE TRENCH INSTALL CABLE CARRY OUT JOINTING BACKFILL AND REINSTATE

Responsibility for works: Scottish and Southern Power Distribution

Current status: Advanced planning

Works reference: LP705S30001055

A4000, A40 Western Avenue, Acton

27 February — 23 September

Delays likely Road closure

Works description: Cycle Super Highway 10 - reconstruction and installation of new cycle way - section 58 required

Responsibility for works: Transport for London

Current status: Advanced planning

Works reference: YG432342348

Westway,  Hammersmith and Fulham

27 February — 23 September

Delays likely Road closure

Works description: Cycle Super Highway 10 - reconstruction and installation of new cycle way - section 58 required

Responsibility for works: Transport for London

Current status: Advanced planning

Works reference: YG432342350

 

July 2, 2019

Bookmark and Share