Forthcoming Roadworks in the Ealing Area

Closures and diversions which may cause problems

 
Participate

Sign up for our Ealing newsletter

Comment on this story on the

Forthcoming Roadworks in The Ealing Area

A406,A40 Western Avenue, Ealing

27 June — 28 June

Delays likely Road closure

Works description: CYCLICAL ROUTINE MAINTENANCE, FULL CLOSURE AND DIVERSIONS

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG431391150

A4020 Broadway, West Ealing

24 June — 27 June

Delays likely Contra-flow

Works description: HH Plot 1, 1x50mm MDPE mtrd Supply for new water supply in fw and inCarriageway. Our intention is to complete the Permanent Reinstatement inthe same phase

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU307000808410850425-001

B4491 Popes Lane, Ealing

24 June — 01 July

Delays likely Traffic control (multi-way signals)

Works description: lay new gas main and services approx 3.1m in f/w and 0.84m in c/way

Responsibility for works: Fulcrum Pipelines Limited

Current status: Planned work about to start

Works reference: WY001NSA23186

Camborne Avenue, West Ealing

24 June — 28 June

Delays likely Road closure

Works description: Serv Pipe Relay Ex Fitting Sz P Cway & Fway in Carriageway. Ourintention is to complete the Permanent Reinstatement in the same phase

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU301000031272734-001

B4491 Popes Lane, Ealing

24 June — 01 July

Delays likely  Traffic control (multi-way signals)

Works description:  lay new gas main and services approx 3.1m in f/w and 0.84m in c/way

Responsibility for works:  Fulcrum Pipelines Limited

Current status:  Planned work about to start

Works reference:  WY001NSA23186

A4020 Broadway, West Ealing

25 June — 01 July

Delays likely  Contra-flow

Works description:  DISCONECTING 1 X 2" SERVICE WHICH FEEDS 85 - 87 BROADWAY AT THE MAIN

Responsibility for works:  Cadent

Current status:  Planned work about to start

Works reference:  AZ0071000833192

A4020 Broadway, West Ealing

26 June — 04 July

Delays likely  Lane closure

Works description:  Excavation in footway for electricity disconnection. Backfill & reinstate.

Responsibility for works:  Scottish and Southern Power Distribution

Current status:  Planned work about to start

Works reference:  LP551S30003174

B4491 Popes Lane, Ealing

26 June — 03 July

Delays likely  Traffic control (multi-way signals)

Works description:  lay new gas main and services approx 3.1m in f/w and 0.84m in c/way

Responsibility for works:  Fulcrum Pipelines Limited

Current status:  Planned work about to start

Works reference:  WY001NSA23259

A406 Gunnersbury Avenue (north Circular Road)

18 June — 27 June

Delays likely Lane closure

Works description: Phase 5 - 8 Surfacing Works - S58 required

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG432351166

Madeley Road, Ealing

17 June — 01 September

Delays likely Traffic control (two-way signals)

Works description: Highway improvement scheme

Responsibility for works: Ealing

Current status: Advanced planning

Works reference: DV00665000819

B455 South Ealing Road, Ealing

10 June — 22 October

Delays likely Traffic control (multi-way signals)

Works description: IMGA202336. Replace approximately 1179metres of 14in Cast IronLowPressure gas main with new 355mm PE main by means of insertion.This will include several connections and all services on the street.

Responsibility for works: Cadent

Current status: Planned work about to start

Works reference: AZ0071000838110

A406 Gunnersbury Avenue (north Circular Road)

01 May — 31 August

Delays likely Lane closure

Works description: EXCAVATE TRENCH INSTALL CABLE CARRY OUT JOINTING BACKFILL AND REINSTATE

Responsibility for works: Scottish and Southern Power Distribution

Current status: Advanced planning

Works reference: LP705S30001055

A4000, A40 Western Avenue, Acton

27 February — 23 September

Delays likely Road closure

Works description: Cycle Super Highway 10 - reconstruction and installation of new cycle way - section 58 required

Responsibility for works: Transport for London

Current status: Advanced planning

Works reference: YG432342348

Westway,  Hammersmith and Fulham

27 February — 23 September

Delays likely Road closure

Works description: Cycle Super Highway 10 - reconstruction and installation of new cycle way - section 58 required

Responsibility for works: Transport for London

Current status: Advanced planning

Works reference: YG432342350

 

June 25, 2019