Forthcoming Roadworks in the Ealing Area

Closures and diversions which may cause problems

 
Participate

Sign up for our Ealing newsletter

Comment on this story on the

Forthcoming Roadworks in The Ealing Area

A406 Gunnersbury Avenue, Ealing

06 June — 07 June

Delays likely Lane closure

Works description: FOOTWAY REPAIRS

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG430387260

A406 Gunnersbury Avenue (north Circular Road)

04 June — 13 June

Delays likely Lane closure

Works description: Phase 5 - 8 Surfacing Works - S58 required

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG432351166

A406,A4005 Hanger Lane, Ealing

06 June — 08 June

Delays likely  Traffic control (two-way signals)

Works location:  Unknown

Works description:  TfL speed camera works - RE-CUT LOOPS AND TERMINATE INTO EXISTING CABINET

Responsibility for works:  Transport for London

Current status:  Planned work about to start

Works reference:  YG504413446

B4491 Popes Lane, Ealing

28 May — 10 June

Delays likely Traffic control (multi-way signals)

Works description: lay new gas main and services approx 3.1m in f/w and 0.84m in c/way

Responsibility for works: Fulcrum Pipelines Limited

Current status: Planned work about to start

Works reference: WY001NSA22794

A406 Gunnersbury Avenue (north Circular Road)

01 May — 31 August

Delays likely Lane closure

Works description: EXCAVATE TRENCH INSTALL CABLE CARRY OUT JOINTING BACKFILL AND REINSTATE

Responsibility for works: Scottish and Southern Power Distribution

Current status: Advanced planning

Works reference: LP705S30001055

A4000, A40 Western Avenue, Acton

27 February — 23 September

Delays likely Road closure

Works description: Cycle Super Highway 10 - reconstruction and installation of new cycle way - section 58 required

Responsibility for works: Transport for London

Current status: Advanced planning

Works reference: YG432342348

Westway,  Hammersmith and Fulham

27 February — 23 September

Delays likely Road closure

Works description: Cycle Super Highway 10 - reconstruction and installation of new cycle way - section 58 required

Responsibility for works: Transport for London

Current status: Advanced planning

Works reference: YG432342350

 

June 5, 2019

Bookmark and Share