Forthcoming Roadworks in the Ealing Area

Closures and diversions which may cause problems

 
Participate

Sign up for our Ealing newsletter

Comment on this story on the

Forthcoming Roadworks in The Ealing Area

B455 High Street, Ealing

21 May — 28 May

Delays likely Lane closure

Works location: Unknown

Works description: NHH Plot 1, 1x25mm MDPE mtrd Supply for new water supply in fw and inCarriageway. Our intention is to complete the Permanent Reinstatement inthe same phase

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU307000808800010045-001

A4020 Broadway, West Ealing

22 May — 22 May

Delays likely  Lane closure

Works description:  S81 PLANNED COVER REPLACEMENT--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE

Responsibility for works:  THAMES WATER

Current status:  Planned work about to start

Works reference:  MU026002141HPFJ--00000

A406 Gunnersbury Avenue (north Circular Road)

01 May — 31 August

Delays likely Lane closure

Works description: EXCAVATE TRENCH INSTALL CABLE CARRY OUT JOINTING BACKFILL AND REINSTATE

Responsibility for works: Scottish and Southern Power Distribution

Current status: Advanced planning

Works reference: LP705S30001055

B4491 Popes Lane, Ealing

18 March — 24 May

Delays likely Traffic control (multi-way signals)

Works description: EXCAVATE TRENCH INSTALL CABLE CARRY OUT JOINTING BACKFILL AND REINSTATE

Responsibility for works: Scottish and Southern Power Distribution

Current status: Planned work about to start

Works reference: LP705S30001052

A4000, A40 Western Avenue, Acton

27 February — 23 September

Delays likely Road closure

Works description: Cycle Super Highway 10 - reconstruction and installation of new cycle way - section 58 required

Responsibility for works: Transport for London

Current status: Advanced planning

Works reference: YG432342348

Westway,  Hammersmith and Fulham

27 February — 23 September

Delays likely Road closure

Works description: Cycle Super Highway 10 - reconstruction and installation of new cycle way - section 58 required

Responsibility for works: Transport for London

Current status: Advanced planning

Works reference: YG432342350

 

May 21, 2019

Bookmark and Share