Forthcoming Roadworks in the Ealing Area

Closures and diversions which may cause problems

 
Participate

Sign up for our Ealing newsletter

Comment on this story on the

Nine Month Delay to Gunnersbury Avenue Roadworks
Power Road bridge project lane closures to continue until autumn 2018

Longfield Avenue, Ealing

01 October — 29 October

Delays likely Road closure

Works description: To install 1x HV duct in footway and carriageway, will also need to do a road crossing outside substation.

Responsibility for works: GAS TRANSPORTATION CO LTD

Current status: Planned work about to start

Works reference: ZP011P-0095574/R2

A40 Western Avenue, Perivale

08 October — 11 October

Delays likely Lane closure

Works description: CARRIAGEWAY PATCHING REPAIRS

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG430327669

B452 Northfield Avenue, West Ealing

08 October — 17 October

Delays likely Traffic control (Stop/Go boards)

Works description: 2X JOINT HOLES AND 18M OF TRENCH. VANS WILL BE PARKED IN BAYS NOT OBSTRUCTING THE FLOW OF TRAFFIC. Stop and go may be needed FOR THE GRAB TO CLEAR THE SPOIL. Footway will be open at all times or walk way provided.

Responsibility for works: Scottish and Southern Power Distribution

Current status: Planned work about to start

Works reference: LP551S30002020

B455 Scotch Common, West Ealing

08 October — 11 October

Delays likely Traffic control (Stop/Go boards)

Works description: EXCAVATION - install 2 cab foundations and ducting (trench).50mb of pedestrian management barriers will be around the workarea, to allow footpath for the pedestrians to remain open, there will also be Stop/Go to controll the traffic. when the stop/go removes at 15:30 the work area will be barriered off with 50mb

Responsibility for works: Vodafone

Current status: Planned work about to start

Works reference: NX04178464-RTS-KL

Cedar Grove, Ealing

08 October — 13 October

Delays likely Road closure

Works description: new customer water supply 2x25mm MDPE mtrd, works in the footway and inCarriageway. Our intention is to complete the Permanent Reinstatement inthe same phase

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU307000807057030100-001

Park Parade, Acton

08 October — 13 October

Delays likely Road closure

Works description: new customer water supply 1x32mm MDPE mtrd, works in the footway and inCarriageway. Our intention is to complete the Permanent Reinstatement inthe same phase

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU307000807668760045-001

The Park, Ealing

08 October — 20 October

Delays likely Road closure

Works description: Excavate & connect to CGL Gas Main providing gas supply to new housing development. Approx dimensions: 65m x 0.5m carriageway. Depth: 0.8m. FIRST TIME PERM

Responsibility for works: GAS TRANSPORTATION CO LTD

Current status: Planned work about to start

Works reference: ZP00768351/EPLR

A4020 Uxbridge Road, Ealing

10 October — 13 October

Delays likely Lane closure

Works description: 27/020 tel0197366 - slot cut c/w sensor loops to repair traffic signals SD6 repair feeder plus feed to existing chamber, 10.00-15.00, westbound c/w swapping lane 1 & 2 and f/w to chamber (ped access maintained)

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG516S000000004188

A4020 Uxbridge Road, Hanwell

10 October — 11 October

Delays likely Traffic control (multi-way signals)

Works description: S81 PLANNED COVER REPLACEMENT--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU026002141DCQY--000004

A406 North Circular Road, Park Royal

10 October — 12 October

Delays likely Lane closure

Works description: BLOCK CLOSURE EB# TESTING LIGHTS& BOLLARDS, BULK CLEAN & CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS, GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG431316642

A406 North Circular Road, Park Royal

10 October — 12 October

Delays likely Lane closure

Works description: BLOCK CLOSURE WB# TESTING LIGHTS& BOLLARDS, BULK CLEAN & CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS, GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG431316659

B455 Haven Green, Ealing

10 October — 13 October

Delays likely Lane closure

Works description: 27/247 tel0198044 - slot cut c/w sensor loops to repair traffic signals SD3 & SD4 repair feeder plus feed to existing chamber, 10.00-15.00, northbound c/w swapping lane 1 & 2 and f/w to chamber (ped access maintained)

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG516S000000004190

A4020,B455 The Broadway, Ealing

12 October — 13 October

Delays likely Lane closure

Works description: 27/018 tel0182742 - slot cut c/w sensor loops to repair traffic signals SD2 repair feeder plus feed to existing chamber, To install ducting & underkerb, 10.00-15.00, eastbound c/w lane 1 and f/w to chamber (ped access maintained)

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG516S000000004192

A4020 The Mall, Ealing

12 October — 13 October

Delays likely Lane closure

Works description: 27/018 tel0182742 - To install ducting & underkerb for TfL traffic signal loops, 10.00-15.00, westbound c/w lane 1 and f/w to chamber (ped access maintained) Bus Stop: 733 Suspension

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG516S000000004191

A406 Gunnersbury Avenue (north Circular Road)

12 October — 14 October

Delays likely Lane closure

Works description: BLOCK CLOSURE NB# TESTING LIGHTS& BOLLARDS, BULK CLEAN & CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS, GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG431316682

A406 Gunnersbury Avenue (north Circular Road)

12 October — 14 October

Delays likely Lane closure

Works description: BLOCK CLOSURE SB# TESTING LIGHTS& BOLLARDS, BULK CLEAN & CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS, GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG431316678

A406 North Circular Road, Park Royal

11 October — 13 October

Delays likely Lane closure

Works description: BLOCK CLOSURE EB# TESTING LIGHTS& BOLLARDS, BULK CLEAN & CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS, GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG431316663

A406 North Circular Road, Park Royal

11 October — 13 October

Delays likely Lane closure

Works description: BLOCK CLOSURE WB# TESTING LIGHTS& BOLLARDS, BULK CLEAN & CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS, GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG431316668

B452,B455 Argyle Road, West Ealing

12 October — 17 October

Delays likely Traffic control (multi-way signals)

Works description: Valve Repack 0 to 6" in Carriageway. Our intention is to complete thePermanent Reinstatement in the same phase

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU301000031144221-001

B4491 Little Ealing Lane, Ealing

04 October — 11 October

Delays likely Traffic control (two-way signals)

Works description: LAY NEW SERVICE 2M FROM MAIN IN FOOTWAY

Responsibility for works: Cadent

Current status: Planned work about to start

Works reference: AZ0071000757666

The Park, Ealing

01 September — 31 October

Delays likely Road closure

Works description: Carriageway resurfacing,

Responsibility for works: Ealing

Current status: Planned work about to start

Works reference: DV00665000548

B452,B455 Argyle Road, West Ealing
28 August - 31 October
Delays likely Road closure
Works description: Carriageway resurfacing, including some areas of carriageway reconstruction.
Responsibility for works: Ealing
Current status: Planned work about to start
Works reference: DV00665000536

 

3rd October 2018

Bookmark and Share