Forthcoming Roadworks in the Ealing Area

Closures and diversions which may cause problems

 
Participate

Sign up for our Ealing newsletter

Comment on this story on the

Nine Month Delay to Gunnersbury Avenue Roadworks
Power Road bridge project lane closures to continue until autumn 2018

A4020 New Broadway, Ealing, Ealing
05 September — 08 September
Delays likely Lane closure
Works location: Unknown
Works description: SEW DESCALE EMERGENCY/REACTIVE
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU026002141CYKM--000008
A4020 Uxbridge Road, Hanwell, Ealing
04 September — 08 September
Delays likely Lane closure
Works location: Unknown
Works description: LAY NEW DOMESTIC SERVICE 3M FROM MAIN IN MAIN IN NEARSIDE FOOTWAY
Responsibility for works: Cadent
Current status: Planned work about to start
Works reference: AZ0071000746388
A4020 Uxbridge Road, Hanwell, Ealing
05 September — 06 September
Delays likely Traffic control (multi-way signals)
Works location: Unknown
Works description: S81 PLANNED COVER REPLACEMENT--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU026002141DCQY--000002
B452 Northfield Avenue, West Ealing, Ealing
04 September — 13 September
Delays likely Traffic control (Stop/Go boards)
Works location: Unknown
Works description: 2X JOINT HOLES AND 18M OF TRENCH. VANS WILL BE PARKED IN BAYS NOT OBSTRUCTING THE FLOW OF TRAFFIC. Stop and go may be needed FOR THE GRAB TO CLEAR THE SPOIL. Footway will be open at all times or walk way provided.
Responsibility for works: Scottish and Southern Power Distribution
Current status: Planned work about to start
Works reference: LP551S30002020

 

 

B455 Haven Green, Ealing

13 August — 08 September

Delays likely Lane closure

Works description: IMGA172020 ABANDON 97M X 100MM DI MAIN AND INSERT 90MM PE ANDRELAYORTRANSFER SERVICES

Responsibility for works: Cadent

Current status: Planned work about to start

Works reference: AZ0071000717302

B452,B455 Argyle Road, West Ealing
28 August - 31 October
Delays likely Road closure
Works description: Carriageway resurfacing, including some areas of carriageway reconstruction.
Responsibility for works: Ealing
Current status: Planned work about to start
Works reference: DV00665000536
Hatfield Road, West Ealing
31 August - 06 October
Delays likely Road closure
Works description: Carry out 12no Customer Service relays between the existing Water main and Property boundaries, as part of Thames Waters Lead Pipe Replacement Project
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU276IA/AMP6/EAL/501

 

5th September 2018

 

Bookmark and Share