Forthcoming Roadworks in the Ealing Area

Closures and diversions which may cause problems

 
Participate

Sign up for our Ealing newsletter

Comment on this story on the

A4127 Greenford Road, Greenford

31 August — 31 August

Delays likely Traffic control (multi-way signals)

Works location: A4127

Works description: S81 Planned Cover Replacement--Works Intended To Include First Time Permanent Reinstatement Within Same Phase

Responsibility for works: Thames Water

Current status: Planned work about to start

B452 Northfield Avenue, West Ealing

31 August — 03 September

Delays likely Traffic control (multi-way signals)

Works location: B452

Works description: Main Clamp 6 To 12" Cway In Carriageway. Our Intention Is To Completethe Permanent Reinstatement In The Same Phase

Responsibility for works: Thames Water

Current status: Planned work about to start

Selby Road, Ealing

01 September — 01 September

Delays likely Road closure

Works location: -

Works description: -

Responsibility for works: Thames Water

Current status: Planned work about to start

B4491,A4000 Gunnersbury Lane, Acton

29 August — 03 September

Delays likely Traffic control (two-way signals)

Works location: B4491,A4000

Works description: To Dig Out Buried Thames Water Disctrict Meter, Replace & Fit Steel & Concrete Thrust Walls, Allow Curing Time, Base Slabs And Walls. Complete Reinstatement

Responsibility for works: Thames Water

Current status: Planned work about to start

A4180,B455 Ruislip Road, Northolt

24 August — 01 September

Delays likely Traffic control (two-way signals)

Works location: A4180,B455

Works description: Nc47675 Mains Installation To New Development On Behalf Of Affinity Water Nd - Cw/Fw/Verge - Standard Slg - 2 Way Tl Manned Peak - Fw Closure, Peds Walkway Provided

Responsibility for works: Affinity Water

Current status: Planned work about to start

Western Avenue, Greenford
26 July - 06 May 2018
Delays likely Road closure
Works location: -
Works description: -
Responsibility for works: Transport For London
Current status: Planned work about to start

Gunnersbury Avenue (North Circular Road)

07 June — 16 November 2018

Delays likely Lane closure

Works location: -

Works description: -

Responsibility for works: Transport For London

Current status: Planned work about to start

August 31, 2017

 

Bookmark and Share