A4020,B455 The Broadway, Ealing

23 August — 24 August

Delays likely Traffic control (Stop/Go boards)

Works location: A4020,B455

Works description: 27/018 Tel0145840 - Slot Cut Repair On Tfl Traffic Loop Sd3, 19:00 - 23:00, Stop Works - Loop To Be Cut During Red Phase On Signals. Should Be Completed On The First Night, But A Two Night Duration In Case Of Any Problems At Site

Responsibility for works: Transport For London

Current status: Planned work about to start

A4020 Broadway, West Ealing

23 August — 24 August

Delays likely Lane closure

Works location: A4020

Works description: 27/023 Tel0145867 - Slot Cut Repair On Tfl Traffic Loop Sd2, 19:00 - 23:00, Lane Closure In Lane 1 East Bound Only. Loop Located On Crossing Zig-Zags - Switch Out Will Be Required To Complete The Works. Should Be Completed On The First Night, A Two Night Duration In Case Of Any Problems At Site

Responsibility for works: Transport For London

Current status: Planned work about to start

A4020 Uxbridge Road, Ealing

23 August — 23 August

Delays likely Traffic control (two-way signals)

Works location: A4020

Works description: S81 Planned Cover Replacement--Works Intended To Include First Time Permanent Reinstatement Within Same Phase

Responsibility for works: Thames Water

Current status: Planned work about to start

B452 Northfield Avenue, West Ealing

22 August — 25 August

Delays likely Traffic control (two-way signals)

Works location: B452

Works description: 1x50mm Mdpe New Water Meter Supply In F/Way In Carriageway. Ourintention Is To Complete The Permanent Reinstatement In The Same Phase

Responsibility for works: Thames Water

Current status: Planned work about to start

B455 Castlebar Road, Ealing

23 August — 24 August

Delays likely Lane closure

Works location: B455

Works description: 27/247 Tel0145842 - Slot Cut Repair On Loop Sd5 And Sd0, 09:30 - 15:30, Lane Closure With 2 Way Traffic Maintained Due To Width Of Carriageway And Stop Works. Bus Stop: Bp047 Suspension. Should Be Completed On The First Day, But A Two Day Duration In Case Of Any Problems On Site

Responsibility for works: Transport For London

Current status: Planned work about to start

B455 Scotch Common, West Ealing

22 August — 24 August

Delays likely Traffic control (Stop/Go boards)

Works location: B455

Works description: Excavation Works - New Telecoms Cabinets Being Installed Using Hiab. Stop And Go System Installed To Accomodate Hiab And Works Vehicles

Responsibility for works: O2 (UK) Limited

Current status: Planned work about to start

A4020 Uxbridge Road, Ealing

14 August — 25 August

Delays likely Lane closure

Works location: A4020

Works description: Install 17m Of 1 Way Poly Duct In Carriageway,Install 68m Of 1 Way Poly Duct In Footway

Responsibility for works: BT

Current status: Planned work about to start

A4020 Uxbridge Road, West Ealing

14 August — 25 August

Delays likely Lane closure

Works location: A4020

Works description: Install 31m Of 1 Way Poly Duct In Footway,Install 3m Of 1 Way Poly Duct In Carriageway

Responsibility for works: BT

Current status: Planned work about to start

Western Avenue, Ealing

24 August — 26 August

Delays likely Road closure

Works location: -

Works description: -

Responsibility for works: Transport For London

Current status: Planned work about to start

A4180,B455 Ruislip Road, Northolt

24 August — 01 September

Delays likely Traffic control (two-way signals)

Works location: A4180,B455

Works description: Nc47675 Mains Installation To New Development On Behalf Of Affinity Water Nd - Cw/Fw/Verge - Standard Slg - 2 Way Tl Manned Peak - Fw Closure, Peds Walkway Provided

Responsibility for works: Affinity Water

Current status: Planned work about to start

Western Avenue, Greenford
26 July - 06 May 2018
Delays likely Road closure
Works location: -
Works description: -
Responsibility for works: Transport For London
Current status: Planned work about to start

Gunnersbury Avenue (North Circular Road)

07 June — 16 November 2018

Delays likely Lane closure

Works location: -

Works description: -

Responsibility for works: Transport For London

Current status: Planned work about to start

 