Traffic delays likely as a result of road and lane closures
B455 St Marys Road, Ealing |
10 August — 11 August |
Delays likely Traffic control (multi-way signals) |
Works location: B455 |
Works description: Safe Access To Underground Bt Footway And Carriageway Boxes For Fibre Cabling, Jointing And Desilting Works In Existing Duct. Required For New Customer Connection |
Responsibility for works: BT |
Current status: Planned work about to start |
|
A40/A406 Western Avenue, Ealing |
11 August — 13 August |
Delays likely Road closure |
Works location: A40/A406 |
Works description: Cyclical Routine Maintenance Full Closure Under S6 Tro |
Responsibility for works: Transport For London |
Current status: Advanced planning |
|
A40 Western Avenue, Perivale |
11 August — 12 August |
Delays likely Lane closure |
Works location: A40 |
Works description: Block Closure Wb# Testing Lights& Bollards, Bulk Clean & Change, Sweeping, Gully & Beany Block Cleaning, Barrier Works, Grass Cutting, Sign Cleaning, Debris Patrols |
Responsibility for works: Transport For London |
Current status: Planned work about to start |
|
A4005/A406 Hanger Lane, Ealing |
08 August — 12 August |
Delays likely Lane closure |
Works location: A4005/A406 |
Works description: Investigation Works On The Top Side Of Lane 7 & 8 And Footway |
Responsibility for works: Transport For London |
Current status: Planned work about to start |
|
B4491 Little Ealing Lane, Ealing |
08 August — 21 October |
Delays likely Lane closure |
Works location: B4491 |
Works description: Carriageway And Footway Improvements |
Responsibility for works: Ealing London Borough Council |
Current status: Planned work about to start |
|
B4491 Popes Lane, Ealing |
28 July — 25 August |
Delays likely Traffic control (two-way signals) |
Works location: B4491 |
Works description: Approx 250m Excavation Dual Hv Circuit - Hv Supply To New Brentford Stadium Development. Lane Closure. |
Responsibility for works: Gas Transportation Co Ltd |
Current status: Advanced planning |