Roadworks in the Ealing Area

Traffic delays likely as a result of road and lane closures

Participate

Ealing Traffic and Travel Information

Sign up for our weekly Ealing newsletter

Comment on this story on the

B455 St Marys Road, Ealing
10 August — 11 August
Delays likely Traffic control (multi-way signals)
Works location: B455
Works description: Safe Access To Underground Bt Footway And Carriageway Boxes For Fibre Cabling, Jointing And Desilting Works In Existing Duct. Required For New Customer Connection
Responsibility for works: BT
Current status: Planned work about to start

A40/A406 Western Avenue, Ealing

11 August — 13 August

Delays likely Road closure

Works location: A40/A406

Works description: Cyclical Routine Maintenance Full Closure Under S6 Tro

Responsibility for works: Transport For London

Current status: Advanced planning

A40 Western Avenue, Perivale

11 August — 12 August

Delays likely Lane closure

Works location: A40

Works description: Block Closure Wb# Testing Lights& Bollards, Bulk Clean & Change, Sweeping, Gully & Beany Block Cleaning, Barrier Works, Grass Cutting, Sign Cleaning, Debris Patrols

Responsibility for works: Transport For London

Current status: Planned work about to start

A4005/A406 Hanger Lane, Ealing
08 August — 12 August
Delays likely Lane closure
Works location: A4005/A406
Works description: Investigation Works On The Top Side Of Lane 7 & 8 And Footway
Responsibility for works: Transport For London
Current status: Planned work about to start
B4491 Little Ealing Lane, Ealing
08 August — 21 October
Delays likely Lane closure
Works location: B4491
Works description: Carriageway And Footway Improvements
Responsibility for works: Ealing London Borough Council
Current status: Planned work about to start

B4491 Popes Lane, Ealing

28 July — 25 August

Delays likely Traffic control (two-way signals)

Works location: B4491

Works description: Approx 250m Excavation Dual Hv Circuit - Hv Supply To New Brentford Stadium Development. Lane Closure.

Responsibility for works: Gas Transportation Co Ltd

Current status: Advanced planning

August 11, 2016

Bookmark and Share