Roadworks in the Ealing Area

Traffic delays likely as a result of road and lane closures

Participate

Ealing Traffic and Travel Information

Sign up for our weekly Ealing newsletter

Comment on this story on the

A40/A406 Western Avenue, Ealing, Ealing
28 January — 30 January Road closure
Delays likely due to Streetworks
Cyclical Routine Maintenance Full Closure Under S6 Tro Wb Bore Closure 28.01 Eb Bore Closure 29.01 at A40/A406
Responsibility: Transport For London
EToN status: Planned work about to start
A4127 Greenford Road, Greenford, Ealing
28 January — 01 February Traffic control (two-way signals)
Delays likely due to Streetworks
S81 Planned Cover Replacement--Works Intended To Include First Time Permanent Reinstatement Within Same Phase at A4127
Responsibility: Thames Water
EToN status: Planned work about to start
Broadway, Hanwell, Ealing
27 January — 29 January Lane closure
Delays likely due to Streetworks
- at -
Responsibility: Thames Water
EToN status: Planned work about to start

27th January 2015

Bookmark and Share