Roadworks in the Ealing Area |
||||||||
Traffic delays likely as a result of road and lane closures
small pinchpoint poss closure Traffic lights, etc: Road closure A40/A406 Western Avenue, Ealing 13 August — 14 August Delays likely Road closure Works location: A40/A406 Works description: Asbestos Encapsulation - Pre Scheme Investigation Works Wb Closure 2300 To 0500 Responsibility for works: Transport For London Current status: Advanced planning A40 Western Avenue, Northolt 13 August — 14 August Delays likely Lane closure Works location: A40 Works description: Set Up Of Crash Cushion Tm To Replace Lamps On Traffic Signal Pole. Short Stay. Traffic Signal Pole 10. Lane 1 West Bound. 2200 - 0200 Mark Mageyue - 27/151 Anl1058307 Responsibility for works: Transport For London Current status: Planned work about to start A40/A4000 Western Avenue, Acton 13 August — 14 August Delays likely Lane closure Works location: A40/A4000 Works description: Set Up Of Crash Cushion Tm To Replace Cable For Lamps On Traffic Signal Pole After Intermittent Fault. Short Stay. Traffic Signal Pole 6 Lane 1 East Bound. 2200 - 0200 Responsibility for works: Transport For London Current status: Planned work about to start Uxbridge Road, Acton 11 August — 13 August Delays likely Traffic control (give & take) Works location: - Works description: - Responsibility for works: Thames Water Current status: Planned work about to start A40 Western Avenue, Northolt 14 August — 15 August Delays likely Road closure Works location: A40 Works description: Urgent Critical Carriageway Defects Lane 1 And 2 Closure Leading Up To Polish War Memorial And Full Closure Between Polish And Target Eb 2300 To 0500 Responsibility for works: Transport For London Current status: Advanced planning A4127 Tentelow Lane, Southall 13 August — 15 August Delays likely Traffic control (two-way signals) Works location: A4127 Works description: Install 2 X 32mm New Water Services - Excavation In The Cw/Fw - Potential Open Cut Trench Works Of 1.5m In The Cw / 2.0m In The Fw - Working With Chapter 8 Signing & Guarding And 2 Way Traffic Lights ( Restricted Hours 09:30 - 15:30) - Agreed Between Neil Buckley & Mark Reilly Responsibility for works: Affinity Water Current status: Planned work about to start B455 South Ealing Road, Ealing 20 August -29 August Delays likely Lane closure Location : B455 Description : To excavate trench and install ducting for future cable pull work will carried out under traffic management Current status: Planned work about to start Traffic lights, etc: Traffic control (multi-way signals) Queries should be addressed to Southern Electric quoting reference LP701MP212401 August 14, 2014 |